Joint Coastal Permit Fees

 
  1. Coastal Construction Permit Fees
  2. Environmental Resource Permit fees
    1. Individual and Conceptual Approval Permits
    2. Standard General Permits
    3. Noticed General Permit
    4. Modifications
    5. Variances
  3. Wetland Resource Permit fees
    1. Modifications
    2. Variances
  4. Sovereignty Submerged Lands Authorization Fee

 

Joint Coastal Permit (JCP) Fees

Joint Coastal Permit fees are the sum of the fees required by 62-4.050(4)(d) or (g), 62B-41.0085(3), and 18-21.008, .009, or .010, F.A.C.  Environmental Resource Permit fees are the sum of the fees required by 62-4.050(4)(g) and 18-21.008, .009, or .010.  Wetland Resource Permit fees are the sum of the fees required by 62-4.050(4)(d) and 18-21.008, .009, or .010.  For more information regarding these fees, please contact the Environmental Permitting staff.

Calculating JCP Fees

JCP Fee Calculation Sheet

(07 Excel file, and can be opened with 07 Excel or a converter)

*Please note this does not calculate modifications

 

Coastal Construction Fees

62B-41.0085(3), F.A.C.

1)  Applications for construction and major modifications to existing coastal structures, any part of which are sited seaward of mean high-water on sovereignty submerged lands, shall be assessed a fee in accordance with the following schedule:

a) Rigid coastal structures:

1) Up to 100 feet in length.

$2,000

2) For each additional 50 feet of length or portion thereof.

$500

b) Beach restoration

1) For first 50,000 cubic yards of fill.

$2,000

2) For each additional 50,000 cubic yards of fill, or portion thereof.

$500

c) Construction and maintenance dredging of inlets:

1) For the first 10,000 cubic yards of dredged material

$2,000

2) For each additional 10,000 cubic yards of dredged material or portion thereof if such material is placed in an upland or offshore disposal site.

$250

3) For each additional 50,000 cubic yards of fill or portion thereof if such material is placed on the beach or approved nearshore area.

$500

d) Inlet-related structures, major reconstruction and other major structures and activities: per structure.

$1,000

e) Minor structures and activities, minor reconstruction of existing structures, amended applications, major modifications to existing permits and administrative approval of each subsequent nourishment or maintenance dredging operation.

$500

f) Requests for renewal reviews for long term inlet maintenance dredging permits.

$750

g) Requests for time extensions or transfer of existing permits.

$100
2)  Permit fees for each individual structure, except minor structures, shall be added together for each application.
3)  The cost for special public notice incident to issuing permits under this Chapter shall be borne by the applicant. If the Department of Environmental Protection incurs any expense, notice to proceed shall not be issued until such costs are reimbursed.
4)  For projects which are cost-shared under Chapter 62B-36, F.A.C., with the state government, the local government may request waiver of the that portion of the fee above the local government pro rata share. In no case will the local pro rata share be less than $2,000.
5)  Experimental projects permitted under rule 62B-41.0075 shall be assessed the larger of a fee of $5000, or the permit fee specified in the appropriate fee schedule above, except the maximum fee shall not exceed $20,000.
6)  The Department is authorized to waive the permit application fees for removal, without replacement, of existing derelict coastal structures if a determination is made that they serve no public purpose, endanger human life, health or welfare, or are unnecessary or undesirable.

Back to top of page

 

Environmental Resource Permit Fees

Chapter 62-4.050(4)(h), F.A.C.

 

Individual and Conceptual Approval Permits

Those systems that involve > 1 acre of construction or alteration in, on or over wetlands or other surface waters, involve > 10 new boat slips, are capable of impounding > 120 acre feet, serve a total land area > 100 acres, or provide for the placement of > 12 acres of impervious surface.

1) For a system that involves <1 acre of construction alteration in, on or over wetlands or other surface waters and involves < 10 new boat slips but reaches any of the following three thresholds:

a) is capable of impounding > 120 acre feet
b)
serves a total land area > 100 acres; or
c)
provides for the placement of > 12 acres of impervious surface.

$2,500
2) For a system involving the following total acreage of construction or alteration in, on or over wetlands or other surface waters:

a)  > 100 acres

$10,000

b) < 100 acres and > 50 acres

$8,000

c) < 50 acres and > 10 acres

$6,500

d) < 10 acres and > 5 acres

$5,500

e) < 5 acres and > 2 acres

$4,000

f) < 2 acres and > 1 acre

$3,000

Back to top of page

Standard General Permits

(Those systems below the thresholds listed above)

1)  For a system serving a project with a total land area < 100 acres and > 40 acres, with the following additional activities:

a) Either the construction of 1- 9 new boat slips or the construction or alteration (other than new boat slips) in, on or over a total area of wetlands or other surface waters < 1 acre and > 0 acres.

$1,000

b) No construction or alteration in, on or over wetlands or other surface waters.

$700
2)  For a system serving a project with a total land area < 40 acres and > 1 acre involving construction or alteration (other than new boat slips) in, on or over a total area of wetlands or other surface waters < 1 acre and > 0 acres. $600
3)  For a system serving a project with a total land area < 1 acre, involving construction or alteration (other than new boat slips) in, on or over a total area of wetlands or other surface waters < 1 acre and > 0 acres. $500
4)  Environmental Resource Permit for a system serving a project with a total land area < 40 acres and involving no construction or alteration in, on or over wetlands or other surface waters. $300

Noticed General Permit

Noticed General Permit (see rule 62-341 for specific qualifying activities.) 

$100

Exemption Determination

De minimus exemption.

$100

Modifications

1)  For major modifications of Individual and Conceptual Approval Permits (no increase in project area.) $700
2)  For major modifications of Individual and Conceptual Approval Permits (with an increase in project area). $2,000
3)  For major modifications of Standard General Permits. 50% of original application fee

4) Minor modifications (62-4.050(4)(s)1-5 )

a) Minor errors or typographical mistakes and that do not involve technical review.

$0

b) Changes requested by the Department or required through permits issued by other regulatory agencies, and to change due dates for reporting or performance deadlines when such changes in the due date do not involve any new work, any new work locations, or any new activities, and will not alter, replace, or otherwise eliminate the requirements for otherwise performing the work required by the permit

$0

c) Transfers of permits or time extensions.

$50

d) Minor technical changes which involve new work, new work locations, new activities, or any other change which alters, replaces, or otherwise eliminates the work authorized by the permit when the original permit fee of the issued permit is less than $300, except for modifications to permits issued pursuant to Section 403.816, F.S.

$50

e) Minor technical changes which involve new work, new work locations, new activities, or any other change which alters, replaces, or otherwise eliminates the work authorized by the permit when the original permit fee of the issued permit is more than or equal to $300, except for Domestic Wastewater Facility Permits, Industrial Wastewater Facility Permits, Drinking Water (Public Water Supply) Permits, Underground Injection Control Permits and permits issued pursuant to Section 403.816, F.S.

$250

Variances

    Variances $500

Back to top of page

 

 Wetland Resource Permit (Dredge and Fill Permit) Fees

  Chapter  62-4.050(4)(e), F.A.C.

These permit fees pertain to projects that have been grandfathered according to Sections 373.414(11)(1994 Supp.), (12)(a)(1994 Supp.), (13), (14), (15) or (16), F.S. and projects, or portions thereof, located in the Northwest Florida Water Management District.
1)  Dredge and fill construction projects up to and including 5 years:

a) Standard form projects including dredge and fill activities that affect 10 or more acres  of jurisdictional area pursuant to Rule 62-312.070(2), F.A.C.

$4,000

b) Short form construction projects involving dredging and filling activities that affect 9.99 acres or less of jurisdictional area, pursuant to Rule 62-312.070 (2), F.A.C.

$500
2)  Dredge and fill construction permits in excess of 5 years:

a) Short form permits from 6 years up to and  including 10 years.

$3,000

b) Standard form permits over 5 years

$1,000 per year total

c) 6 to 10 year permits for beach restoration projects approved pursuant to Chapter 161, F.S., and to maintenance dredge navigation channels, port harbors, turning basins and harbor berths located within deepwater ports, pursuant to Section 403.816, Florida Statutes.

$5,000

Modifications

Modifications

$250

Variances

Variances

$500

Back to top of page

 

Sovereignty Submerged Lands Authorization Fee 

  Chapter 18-21.008, .009, or .010, F.A.C.

a)  Fee for processing an easement or lease application $540

 

Back to top of page

Last updated: October 09, 2008