Florida Department of Environmental Protection Florida Department of Environmental Protection
More Protection, Less Process
* DEP Home * About DEP * Programs * Contact * Site Map * Search
MyFlorida.com  
Programs
» Water Home
» Beaches
» Drinking Water
» Everglades
» Grants & Loans
» Ground Water
» Mining & Minerals
» Monitoring
» Special Projects
» Springs
» Stormwater
» TMDLs
» Underground Injection
» Wastewater
» Water Policy
» Watersheds
» Wetlands
Information
» Forms & Applications
» Rules
» Permits
» Contacts
» Data
» Publications
» Public Notices
Navigation
» Sitemap

 

Get Adobe Acrobat Reader software.

Documents are Adobe Acrobat files, which will open in a new window, unless indicated, and require the free Reader Software.

Total Maximum Daily Loads Highlights

Total Maximum Daily Loads Program
 

News & Announcements

New! The Department announces the availability of five draft fecal coliform Total Maximum Daily Load (TMDL) reports for waters in the Lower St. Johns River basin for stakeholder review and comment. The public is invited to attend a workshop on these TMDLs that will be held in Conference Room A, Northeast District Office, Florida Department of Environmental Protection, 7825 Baymeadows Way, Jacksonville, FL 32256, on March 26, 2010, beginning at 9:30 AM. Written comments will be accepted through April 12, 2010, and should be directed to: Jan.Mandrup-Poulsen@dep.state.fl.us.

New! The Department announces the availability of revised TMDL reports for impaired waters in the Tampa Bay and Hillsborough River basins. Changes in the reports proposed in 2009 are displayed with strike-throughs and underlines to facilitate review. Those who prefer a copy of the revised reports without the changes being displayed may contact Mr. Jan Mandrup-Poulsen, the section administrator for the Watershed Evaluation and TMDL Section, at Jan.Mandrup-Poulsen@dep.state.fl.us. Pursuant to 120.56(2)(a) F.S., a substantially affected person may petition for a hearing on the proposed changes within 20 days after the date of publication of the Notice of Change, or by Thursday Thursday, March 11, 2010.

Everglades sceneWhat is a TMDL?

A scientific determination of the maximum amount of a given pollutant that a surface water can absorb and still meet the water quality standards that protect human health and aquatic life. Water bodies that do not meet water quality standards are identified as "impaired" for the particular pollutants of concern--nutrients, bacteria, mercury, etc.--and TMDLs must be developed, adopted and implemented for those pollutants to reduce pollutants and clean up the water body.

The threshold limits on pollutants in surface waters--Florida's surface water quality standards on which TMDLs are based--are set forth primarily in rule 62-302, Florida Administrative Code, and the associated table of water quality criteria.

What are the basic steps in the TMDL program? How does it work?

  1. Assess the quality of surface waters--are they meeting water quality standards?
  2. Determine which waters are impaired--that is, which ones are not meeting water quality standards for a particular pollutant or pollutants.
  3. Establish and adopt, by rule, a TMDL for each impaired water for the pollutants of concern--the ones causing the water quality problems.
  4. Develop, with extensive local stakeholder input, a Basin Management Action Plan (BMAP) that....
  5. Implement the strategies and actions in the BMAP.
  6. Measure the effectiveness of the BMAP, both continuously at the local level and through a formal re-evaluation every five years.
  7. Adapt--change the plan and change the actions if things aren't working.
  8. Reassess the quality of surface waters continuously.

The Divisions are working on a more comprehensive approach to protecting Florida water quality involving basin-wide assessments and the application of a full range of regulatory and non-regulatory strategies to reduce pollution.  The Total Maximum Daily Load (TMDL) is the heart of this comprehensive approach.


For more information, send e-mail to Jan Mandrup-Poulsen (Jan.Mandrup-Poulsen@dep.state.fl.us)

Total Maximum Daily Load Program
2600 Blair Stone Road - Mail Station 3555
 Tallahassee, FL, 32399-2400
Phone: (850) 245-8449

Background

Basin Management Action Plans (BMAPs)

Florida's TMDL Program: The First Five Years

Florida TMDL Protocol Document

Frequently Asked Questions

Glossary

Overview of TMDL Program

Pollutant Trading PAC

Watershed Assessment

TMDL Documents

Other WWW TMDL Links


Visit "Florida's Water - Ours to Protect"

Last updated: March 10, 2010

  2600 Blair Stone Road M.S. 3500   Tallahassee, Florida 32399   850-245-8336 (phone) / 850-245-8356 (fax) 
DEP Home | About DEP  | Contact Us | Search |  Site Map